Oak Hills Remodel- Cape Girardeau, MO
Towards the end of last summer a new client was given my name to assist in a selecting some new finishes for a fresher updated look throughout the main areas of the home and a complete remodel of the upstairs Jack and Jill bathroom.
A lot of attention when into the planning and scheduling to make sure it was a well orchestrated project ; with subs staying on task and timeline.
The majority of the home:
The casing and base trim was painted, the old hardwood was removed, new hardwood was installed, new carpet going up the steps was ordered and installed and new light fixtures were selected and changed out.
In the Jack and Jill bath:
The carpet was removed from the floor, new 12x24 tile was installed on a brick pattern, the dated brass framed sliding shower doors were removed and the holes were professionally sealed, wallpaper was roomed and the walls and the cabinetry were painted coordinating colors, a new marble looking quartz with under mount sinks was swapped out with the existing cultured marble, new chrome fixtures, hardware and accessories (shower curtain rod, rings, shower curtain, silver beaded mirror, towel rings and bar and tissue holder were ordered and installed.
The project stayed on schedule and was kept to a minimum time frame due to the fact that the client chose to stay at the home during the remodel.